Aller au contenu
AIR-DEFENSE.NET

Recce2

Members
  • Compteur de contenus

    27
  • Inscription

  • Dernière visite

Messages posté(e)s par Recce2

  1. mais c'est écrit dessus, y'avait pas moyen de se tromper ! D'où sors-tu ce "A" ?

    Remarque, il reste encore 3 hélicos à identifier au dessus !

    "AB-..." est la dénomination officielle des hélicos de chez Bell

    Pour ce qui est des 3 hélicos de dessus, ne serait-ce pas des EC-135 ?

  2. Les améliorations Barak Zoher et Dor Dalet ne concernent que les Mark III, camarade  ^-^

    Je ne veux pas engager de polémique ni mettre en doute ce que tu dis mais d'après ce site (http://www.waronline.org/en/IDF/arms/merkava.htm)

    Le Merkava Mk IID se nomme aussi Merkava siman 2 Bet dor Dalet.

    Voici le passage qui en parle:

    Merkava siman 2 Bet dor Dalet

    Image IPB

    (Merkava mk.2B with fourth generation armor) - the modernization of existing Merkava mk.2B,

    the main difference is additional armor plates on the chassis and the turret, the so-called "fourth

    generation armor" (dor - generation in Hebrew). Not to confuse with 4th generation tank,

    this only means that Merkava mk.1 had first generation armor, mk.2 - second, and mk.3 - third.

    The add-on armor plates are fourth generation.

    Sometimes this tank is also called Merkava Mk.2D

    The visual difference is the additional armor modules on the turret sides that are curved downwards,

    as opposed to Merkava mk.3 dor Dalet modules which extend sideways. The tank also has easily

    noticeable additional armor plates on the sides of the chassis above the sideskirts, and on the front

    left side above the driver's position.

  3. Il sert à quoi ce véhicule ?  :O

    GSP-55 Heavy Amphibious Ferry

    Image IPB

    The GSP is built on two tracked amphibians, placed side by side and flanked by two large steel pontoons. The set consists of two half-ferries. In travel position, one pontoon is folded an amphibian. After launching, the pontoons are lowered to the outer sides of the amphibians. For loading and unloading, the ferry is equipped with a ramp extending from the outer sides of pontoons. The pontoons are filled with foam plastic to make them unsinkable.

    Technical data

    Weight: 17.0 t each amphibian

    Load capacity: 52.0 t (i.e. IS-2 heavy tank, T-54/55/72 tanks)

    Length:

    Width:

    Height:

    Draft: 1.20 m

    Powerplant: 8D6 (W6K) diesel engine, 200 hp

    Maximum Speed: land 40-45 kph, water 10 kph

    Range: land 500 km, water 8-10 hour

    © Copyright Leszek Chmielewski 1997-2003

    Source:http://www.orasoft.net.pl/~leszek.ch/museum/vgsp55.html

×
×
  • Créer...